Building a house, early stages of construction.

Floor plans are so exciting- more details to come!

I have been busy meeting with subcontractors, designing and selecting materials for the new house my husband and I are building.

Inspiration, color scheme, details!

Since we decided to downsize, this house will be a slab home. I am really excited to show you some of the progress.

This image has an empty alt attribute; its file name is img_1599.jpeg
Foundation, plumbing and electrical rough-ins.
Framing

The flat work, framing, roofing, rough-in plumbing, rough-in electrical and rough-in heating and air conditioning are done. The work passed inspection and now the house is ready for insolation and sheet rock!

I will be able to see my garden from my kitchen window!
This will be the view from the master bedroom. I can’t wait to landscape.
Master bathroom.
Guest bedroom.
This image has an empty alt attribute; its file name is img_1759.jpeg
Back view of the house; kitchen window and my husband’s office.
This image has an empty alt attribute; its file name is img_1791.jpeg
Rear of house, a small covered patio.
Front view; I am excited that I will have lots of light in my small studio

I just can’t wait to start doing some of the projects I have lined up for this house. I will keep you posted.

Until next time!

Rosalia

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s